I noticed that my new 2020 320S Victron 75\15 Solar controller's Load terminals were unused. Twelve volt power is routed straight to the power converter from the battery on\off switch. So, although m… (View Post)
That's a great trip! Very similar to one I was hoping to do this Fall. I'd like to see the Aurora near Banff. I was thinking that I needed to complete my basement insulation and heating project first… (View Post)
I too am considering basement insulation strategies to extend full liquid operations during colder weather. I've found that tank heating elements draw too much current to allow use off-grid. I'm expl… (View Post)