I would check for things connected to the battery before the battery switch. Solar chargers are an example and are generally not part of the battery switch circuit. Same goes for any added chargers. … (View Post)
@ReenieG I used only 1/2" 3M 5952 tape with no other sealant or adhesive. The gaps were only an inch wide at each lower corner in case water got under the panel so it could drain out. 1" wi… (View Post)
The original leaks were likely caused by not winterizing, so they would fail in the same locations again in freezing weather after the repair... (View Post)