You're on the right track @Robermcm. The length of the battery cables needed will depend on where you put the shunt and second battery. For my install I bought two pairs of 12" cables with 3/8&q… (View Post)
We installed a 2nd solar controller for our ground-based panels today. It is on the passenger side of the trailer, next to the battery cut-off switch. On our last T@B, we had installed a connector on… (View Post)
@YanniLazarus This may seem 'out of the box', but something like this will do what you want... DECO Hydraulic Wheel Load Checker, 0-1500 Pounds (speedwaymotors.com) It is designed for checking load o… (View Post)